Skip to main content

Sabah Al Mustaqbal

Sale AED 10

Road Base UAE

Road base material for your specified pavement and hardstanding requirements. SMGC welcomes bulk supply enquiries with the required grading, source requirements, quantity and delivery location.

  • Material selection against the project specification.
  • Bulk delivery arrangements confirmed by quotation.
  • Based in Baniyas West, Abu Dhabi, UAE.

Request a road base quotation

Original price was: 12,00 د.إ.Current price is: 10,00 د.إ.

Road Base UAE – Project Material Supply

SMGC — Sabah Al Mustaqbal General Contracting LLC supplies road base material against confirmed project requirements. Contact our team in Baniyas West, Abu Dhabi, with your grading specification, quantity and delivery location to request availability and a quotation.

Choosing Material for the Base Course

Road base is used as a prepared material layer within a pavement or hardstanding design. The material selection, layer thickness and compaction requirements depend on the project and the expected service conditions.

Road base may be produced from different sources and material combinations. If the project requires virgin aggregate, permits recycled content or specifies a particular source, state this clearly at the enquiry stage. A product described as road base should be checked against the actual grading and performance requirements.

Information Required for a Quotation

  • Required road base grading or the project specification reference.
  • Permitted material source and any recycled-content requirements.
  • Quantity, selling unit and intended delivery schedule.
  • Site location, vehicle access and unloading area.
  • Required test documents, samples or material approvals.

For projects with prescribed bearing-capacity, plasticity, grading or chemical limits, provide those criteria with your enquiry. Any acceptance testing and compaction requirements should follow the project specification.

Bulk Orders and Delivery

Bulk supply enquiries are welcome. Confirm whether the order is measured by weight, loose delivered volume or another agreed basis. A specified compacted layer volume should be identified as such so it is not confused with a vehicle’s loose load volume.

For phased works, provide a delivery schedule showing the quantities required at each stage. Availability, transport cost and delivery timing are confirmed with the quotation and agreed site arrangements.

What This Listing Covers

This listing is for road base material enquiries. If your requirement also includes spreading, watering, levelling or compaction, identify that scope separately so the enquiry is clear. The quotation will identify the agreed material-supply scope and any separately requested work.

The product image is representative; particle distribution and appearance vary with the source and selected grading.

Contact SMGC

Call +971 56 988 5559 or +971 2 626 9786, email [email protected], or request your road base quotation online.